Home Layouts

   
 

Bob Stelmach’s Red Pine & Oxville RR

Both hi-rail and scale S equipment co-exist on Bob’s layout, accomadated by closing-frog turnouts. The RP&O short line serves mid-Michigan, with an NYC mainline interchange. Industries include a coal mine, gravel business, logging, agriculture, and small-town operations.  

 

 

Gaylord Gill’s Buffalo & Chautauqua RR

The Buffalo and Chautauqua is Gaylord Gill’s S scale representation of the Pennsylvania Railroad’s Northern division in 1953 the layout is centered on the PRR Babcock Street yard. Trains run Southeast along the Buffalo Main towards Emporium, PA.In the other direction trains run Southwest on the Chautauqua branch as far as Brocton, New York. The layout is built for operations with a single track main line in a point-to-point configuration. The 320 ft main line terminates at each end in hidden reversing loops. The track work is code 100, minimum radius is 43 in and maximum grade is 2%. Besides the information on this page, you can find additional stats and photos of Gaylord’s work at the NASG layouts page https://nasg.org/Layouts/S/indexGillGaylordYBuffalo___Chautauqua.php

 

 

Ken Snyder’s Layout

Ken’s high rail layout features California Creations Christmas village buildings. Hand painting each building was a side hobby started 40 years ago. When the current layout was built, its goal was to combine the Christmas village with the long stored childhood Flyer set. 

All locomotives, original Gilbert AF and modern, have been converted to DCC with modern can motors. 

The layout features numerous electronic animations running on Picaxe brand processors including; crossing gates, a rotating lighthouse beacon, Christmas tree lights, all turnouts and signals, and home made DCC throttle based on a AF-18 transformer.

A highlight is the trolley which runs autonomously through the village streets. 

 

 

Jeff Jundt’s Dakota Farm Module

Jeff built this farm module based on his home state of South Dakota. The grain elevator is scratch-built, and he added very realistic livestock fencing.See more of Jeff’s layout on his web site https://sites.google.com/view/dakota-rails/

 

 

Bill Bartlam’s Surrey Valley RR

The Surrey Valley Railroad is a freelanced short line set in the mid-1950s that provides passenger and freight service to several small towns along its’ route. It is point-to-point with return loops at each end. There are 15 rail-served industries, 7 towns, and 2 interchanges. Trains of the NYC and B&O cross 7 bridges and a long curved trestle. It accommodates both steam and diesel power. At one end is an engine servicing facility and freight yard. At the other end, trains enter hidden staging. The railroad is fully signaled. Scenery is 100% complete. A branch line diverges at one junction and trains traveling there serve 2 coal mines and a paper mill. The railroad has been built since 2013 by Bill, MMR Ron King, and SMSG fellow modelers John Racey and Mark Charles. MMR Joe Kocsis built the control panels, the occupancy detection and signaling system, and Brian Federoff completed the work after Joe’s passing. The layout is NCE DCC controlled

 

 

Brooks Stover’s Buffalo Creek & Gauley RR

 
Brooks Stover has been researching and modeling the Buffalo Creek & Gauley RR of West Virginia for over 40 years.  His current 12′ X 25′ layout depicts the BC&G as it was in the summer of 1964.  The layout is 100% complete and features scratchbuilt structures and DCC sound equipped locomotives.  Trains run on Fox Valley Models code 138 track and turnouts.  The layout has been featured in all the major multi-scale magazines.  Photos and additional information about the layout, videos of the layout in operation, and the prototype information about the BC&G can be found on Brooks’ website at  www.buffalocreekandgauley.com.

 

 

 

Dan Kempf’s Clear Creek RR

A narrow-gauge layout based on Clear Creek, Colorado.

 

 

Jerry Poniatowski’s Layout

Jerry’s layout has been reactivated after a recent move. He writes, “I built the layout as sectional, similar to the club’s display layout.  I had seen too many layouts destroyed in moves to do otherwise.  It was dismantled, stored almost a full year in a climate controlled storage unit, then assembled in the new location without a hitch.”